Red cedar shingles are installed on the roof; window installation begins; and the pre-built cupola is lifted to the top of the garage. Also: a trip to Vermont to see reproduction light fixtures. In the second half: installing a washer and dryer; adding a chandelier to a dining room; and using a power driver.