Home / Series / Rebuilding Tally Ho / Aired Order / Season 6 / Episode 23

Crazy Boatbuilding Joinery / New Tanks!

In this episode we follow some really interesting and complex joinery on deck. The hatch sills, built by Clifton, feature some mind-bending half-lap mitre joints and some very challenging coves. The bulwark termination block is an unusual feature that Tally Ho was originally built with, and gets remade from some large purple heart blocks. We also receive some beautiful new tanks which get installed in the bilge, and have a lot of fun playing with some knives.

English
  • Originally Aired November 6, 2022
  • Runtime 40 minutes
  • Created November 6, 2022 by
    BoatFan
  • Modified November 6, 2022 by
    BoatFan