Home / Series / Rebuilding Tally Ho / Aired Order / Season 4 / Episode 6

Bending Beams & Pipe-Threader Repair

In this episode, I finish twisting the beam shelves into place, bending them into their final positions forward and aft. I receive the repaired part of the pipe threading machine in the mail back from Keith Rucker, who brazed together the broken pieces and replaced the bushings. After reassembling the threading machine, it works wonderfully. Finally, I need to work out an efficient way to fabricate bolts to fasten the beam shelves to the frames, and so I make a few haphazard jibs to help. Pancho takes a bath, and I find another Shipwright to work on the project with me!

English
  • Originally Aired March 21, 2020
  • Runtime 20 minutes
  • Network YouTube
  • Created September 1, 2020 by
    Administrator admin
  • Modified September 1, 2020 by
    Administrator admin