Home / Series / Project Binky / Aired Order / Season 0 / Episode 10
Home / Series / Project Binky / Absolute Order / Season 1 / Episode 30

Howie Did It - Machining the flexi-shaft auxiliary drive. Part 2

This is part two of how we made the flexi-shaft auxiliary drive system in episode 20 of Project Binky. In this part, we make the brackets to hold the alternator, a pulley, an adaptor and then put it all together. There was far too much to show in the normal episode run-time, so we thought we'd make an additional series of videos going into a bit more detail of how we did it. Hope you enjoy it.

English
  • Originally Aired November 25, 2018
  • Runtime 50 minutes
  • Special Position Airs before season 1, episode 21
  • Network YouTube
  • Created May 2, 2020 by
    Administrator admin
  • Modified May 2, 2020 by
    Administrator admin