Advertisement
Home / Series / Practical Engineering / Aired Order / Season 2022 / Episode 23

How This Bridge Was Rebuilt in 15 Days After Hurricane Ian

The Sanibel Causeway was rendered completely impassable to vehicles. Less than a month later, it was open to traffic.

English
  • Originally Aired December 20, 2022
  • Runtime 12 minutes
  • Production Code jVi5p-yyF3c
  • Network YouTube
  • Notes Is a season finale
  • Created December 20, 2022 by
    shriek
  • Modified December 20, 2022 by
    shriek