Home / Series / Life at the cabin by Martijn Doolaard / Aired Order / Season 1 / Episode 38

#38 Finishing the Stone Wall

The first wall facing is being finished. I'm stacking firewood for winter, and the first chestnuts have fallen off the tree. 0:00 Starting the day 1:04 Firewood 4:03 A surprise visit 7:02 Stacking firewood 8:05 Wood stove for the tent 10:21 Installing the wood stove 14:13 Picking stones 16:05 Slippery ramp 16:25 Building the wall 18:22 Shaving battens 19:05 Nailing battens 20:44 Painting battens 21:24 Harvesting potatoes 23:35 Unloading stones 23:58 Off to town 24:48 Chestnuts 26:17 Stone work 27:38 Explanation stone work 30:51 Carrying on through the night 33:16 Morning 37:31 Explanation stone work 39:25 Bread making 44:54 Cooking chestnuts 47:54 Bread out of the oven

English
  • Originally Aired October 2, 2022
  • Runtime 51 minutes
  • Network YouTube
  • Created October 5, 2022 by
    matfsc
  • Modified October 5, 2022 by
    matfsc