Home / Series / Life at the cabin by Martijn Doolaard / Aired Order / Season 1 / Episode 32

#32 Walk to the River, Concrete Ring Beam on the Roof, Finishing the Picnic Table

I'm going for a walk to the river down the valley. I'm finally finishing the picnic table and benches and prepare the roof of the cabin for a concrete belt. 0:00 Intro 00:38 Walk to the River 2:56 Building a bench for the table 5:44 Mixing lime mortar 9:10 Working at night 12:12 Cleaning the mortar joints 13:39 Talking about various mortars 15:32 Back on the roof 18:32 Building formwork 19:41 Building the second bench 20:48 Talk about concrete belt 22:43 Explaining roof structure 23:35 Lunch 26:10 So there are chestnuts 27:53 Cutting the wall plate 28:44 Levelling the beams 32:33 Rain 33:36 Looking at cows 34:26 Beam treatment and paint 38:07 Building the formwork 39:29 Placing rebar 43:30 Visitors 45:15 Concrete day 55:00 Beer and sunset

English
  • Originally Aired August 15, 2022
  • Runtime 56 minutes
  • Network YouTube
  • Created August 23, 2022 by
    matfsc
  • Modified August 23, 2022 by
    matfsc